How to install the Waste System (Pushfitting), LABhttps://www.racmet.com/en-ww/how-to-install-the-waste-system-pushfitting.aspx Academy > LAB > How to install the Waste System (Pushfitting) How to install the Waste System (Pushfitting) The RM DRAIN Assembling procedure asks for simple and rapid manual operations, with no specific or expansive tool The RM DRAIN assembling procedure Mark the connection dimension on the pipe.
Pressfitting systems for Gas Distribution Installations, LABhttps://www.racmet.com/en-ww/pressfitting-systems-for-gas-distribution-installations.aspxIn compliance with the regulations, all fittings in the 4 ranges of Raccorderie Metalliche are externally marked in yellow and they are equipped with a specific yellow O-Ring.
aesPRES GAShttps://www.racmet.com/en-ww/aes-pres-gas.aspxIt stands out of its yellow marking and yellow O-Ring.
inoxPRES GAShttps://www.racmet.com/en-ww/inoxpres-gas.aspxThe Gas range stands out in comparison with the standard range due to its yellow marking on the fittings and the fitting of a yellow NBR/HNBR O-Ring in the toroidal chamber.
Pressfitting systems for Steam Installations, LABhttps://www.racmet.com/en-ww/pressfitting-systems-for-steam-installations.aspxThe pressfitting systems are marked in white or the same colour as the o-rings placed inside the toroidal chamber.